Alliance for the Wild Rockies v. U.S. Forest Service — Project did not cause road-plan noncompliance

Reported / Citable

Case
Alliance for the Wild Rockies v. United States Forest Service
Court
Ninth Circuit Court of Appeals
Judge
Ryan D. Nelson (Donald Trump, 2018); Danielle J. Forrest (Donald J. Trump, 2019); Jennifer Sung (Joseph R. Biden, 2021)
Date Decided
2026-10-09
Docket No.
25-3518
Status
Reported
Topics
environmental law, administrative law, litigation

Background

The Hanna Flats Good Neighbor Authority Project (the Project) seeks to manage vegetation and reduce fuels in the Idaho Panhandle National Forest. Under the National Forest Management Act (NFMA), the Forest Service must ensure its projects are consistent with the Access Amendments to the Idaho Panhandle National Forest Plan, which cap road mileage in the Priest Bears Outside Recovery Zone (BORZ) at a 2011 baseline of 316.4 total linear miles and 314.4 open linear miles. The Project reduces road mileage in the BORZ by 1.2 miles through the closure of Road 1395. However, post-project surveys revealed 338.8 total miles of road in the BORZ—22.4 miles above the 2011 baseline—due to 23.6 miles of roads that existed before 2011 but were inadvertently omitted from the baseline survey. The district court granted summary judgment to the Alliance for the Wild Rockies, holding the Project violated the Access Amendments because total post-project mileage exceeded the 2011 baseline, without analyzing whether the Project caused or contributed to the exceedance. The Forest Service appealed.

The panel reversed summary judgment for the Alliance and remanded. It did not finally resolve the separate HFRA issue that the district court had not reached.

The Court’s Holding

The Ninth Circuit reversed the district court’s summary judgment and remanded for further proceedings. The court held that under Lands Council v. Powell, a project is consistent with a forest plan if it does not cause or contribute to noncompliance; preexisting background noncompliance caused by other factors must be excluded from the analysis. The Forest Service demonstrated that the entire 22.4-mile gap between the post-project total (338.8 miles) and the 2011 baseline (316.4 miles) was attributable to 23.6 miles of preexisting roads omitted from the baseline, and that the Project itself reduces baseline-counted roads by 1.2 miles. The district court erred by applying a straight before-and-after comparison without considering causation. Regarding temporary roads, the court held the Alliance failed to show the Project violated the Access Amendments’ temporary road provisions. The return-to-baseline requirement in Section II.B.1.c. applies only to temporary roads used by the project, not to BORZ-wide background noncompliance. Challenges to the Forest Service’s road-closure practices failed absent factual findings contradicting the Decision Memo’s closure commitments.

The decision turns on the specific record and procedural setting described above. Its operative effect is limited to the relief stated in the disposition; issues the court did not reach remain open on remand or before the assigned district judge, as applicable.

Key Takeaways

  • Under NFMA and the APA, a site-specific project is consistent with a forest plan if it does not cause or contribute to noncompliance; background noncompliance unrelated to the project must be excluded from the consistency analysis.
  • The Forest Service may approve a project in an area exceeding forest plan baselines if it demonstrates the exceedance is entirely due to preexisting conditions not caused by the project, and the project itself reduces baseline-counted road mileage.
  • The Access Amendments’ temporary road provision (Section II.B.1.c.) requires only that temporary roads authorized by a project be closed upon completion, not that the project remedy preexisting BORZ-wide noncompliance.
  • A party forfeits an argument by failing to raise it in summary judgment briefing; the court may exercise discretion to reach forfeited legal issues but declined to do so here on alternative grounds.
  • Courts must defer to an agency’s stated closure methods in a decision memo absent record evidence contradicting those commitments; generalized allegations of past practices are insufficient to set aside a project.

Why It Matters

This decision clarifies the causation standard for NFMA consistency review in the Ninth Circuit, reinforcing that discrete agency actions are judged by their own effects, not by generalized landscape noncompliance. It affirms the Lands Council principle that background violations—such as roads omitted from a baseline survey—cannot be attributed to a new project that actually reduces baseline-counted road mileage. The ruling also narrowly construes the temporary road ‘return to baseline’ requirement, limiting it to project-authorized temporary roads rather than imposing a broad landscape remediation duty. This provides the Forest Service a clear path to implement fuels reduction projects in areas with historical data gaps, so long as the project itself does not worsen noncompliance.

For California practitioners, the practical lesson is to match the requested remedy to the governing procedural vehicle and to preserve a record addressing the court’s stated legal test. The ruling should not be read more broadly than its posture permits.